Understanding Risk Scores: How SiteEcho Reports Work
Every finding in a SiteEcho report is scored by risk and priority — learn what that actually means, and how it helps your team decide what to fix first.

What You'll Find Here
01 — Why a List of Issues Isn't Enough
Ten findings aren't equal. A hairline crack and a failing membrane shouldn't sit on the same line with the same weight.
02 — How Risk Levels Are Defined
Every finding is scored on severity and urgency, not just spotted and logged.
03 — Reading a Risk Score
What High, Medium and Low actually mean for your next decision.
04 — Turning Scores Into Action
How priority ranking helps you brief contractors and allocate budget faster.
Why a List of Issues Isn't Enough
Most inspection reports are just that — a list. Every crack, stain and worn seal gets recorded in the order it was found, leaving you to work out what actually matters. That's fine for an engineer, but it's the wrong starting point for someone who has to decide what gets fixed this month versus next year. A SiteEcho report starts from the decision backwards: what needs attention first, and why.

How Risk Levels Are Defined
01 — Severity
How serious the issue is on its own — structural, cosmetic, or somewhere in between.
02 — Urgency
How quickly it's likely to get worse if left unaddressed.
03 — Location Sensitivity
Whether the issue sits somewhere that affects safety, water ingress, or guest/tenant experience.
04 — Combined Score
The three factors above combine into one clear rating per finding — High, Medium or Low.

Reading a Risk Score
A High score means something needs attention soon — typically active water ingress, structural movement, or damage likely to worsen quickly. Medium covers issues worth planning for, but not urgent this week. Low flags cosmetic or early-stage wear worth monitoring. Every score sits next to the finding itself, mapped to its exact location on the imagery — so nothing gets lost in translation between the drone footage and your maintenance plan.
Reporting Built Around Decisions, Not Just Data
Risk scoring is the core of what makes a SiteEcho report different from raw drone footage or a technical write-up. It's the same system across every service — roof surveys today, drainage and thermal imaging as we grow — so however the inspection happens, what you get back is one consistent, actionable report.